AV-100 Chemical Grout Solves Leakage Problems in Tailings Dam for Large Copper/Gold Mine in Argentina

  • This is a case study whereby acrylamide solution grout was used to achieve the “target residual permeability value” in the rock formation below a future tailings dam for a large copper/gold mine in Argentina.