Skip to main content

10 September 2012

Creativity—Sometimes the Most Important Ingredient

Posted in Industry News

PLACE: Tacoma, Washington
PROPERTY: Oil Recycling Station
PROBLEM: Retaining wall with 10 access holes and two 8" HDPE pipe penetrations less than 4' from railroad tracks. 

The engineering drawing called for "Flexible Material" surrounding these pipe penetrations, but provided no recommendation or specification. Avanti Field Services visited the site and noted the high probability of pipe deflection and movement as tanker cars went over them. This conundrum required a creative solution.