Skip to main content

Acrylic Gels Files

2014 No-Dig Paper: Pipe Grouting Longevity Effectiveness Evaluation

Published Year: 2014

  • There have been many debates regarding the long term effectiveness of a sewer grouting approach. ARCADIS selected 12 sewer segments that had been grouted under various sewer rehab projects for which detailed records of testing and grouting were collected.

AV-100 Chemical Grout (Acrylamide) Technical Manual

Published Year: 2014

  • AV-100 Chemical Grout (Acrylamide) Technical Manual

Magazine Article: Efficient, Economical Grout Solution for Downers Grove

Published Year: 2014

  • Reducing sewer line I&I with grouting allows Downers Grove Sanitary District (DGSD) to avoid major repair expenses.

Magazine Article: Chemical Grouting: An effective tool against groundwater infiltration

Published Year: 2014

  • Groundwater infiltration of sewer pipes is a common problem encountered by municipalities, especially those with aging infrastructure

2013 ISEC-7 Paper - Using Chemical Grout to Control Groundwater Infiltration

Published Year: 2013

  • Chemical grouting has been successfully used for over 40 years to control the movement of groundwater in a wide variety of applications including tunnels, subway systems, sanitary sewers, mines and construction projects.

White Paper: Cement Grout vs. Chemical Grout

Published Year: 2013

  • Cement Grout vs. Chemical Grout: Which One to Use, When, and Why. A White Paper providing guidance to the Geotechnical Community

News: Mitigating Inflow Due to Both Primary and Secondary Permeability in Mining

Published Year: 2013

  • Groundwater infiltration can be due to either primary or secondary permeability. When both types of permeability are present, mitigation requires versatility and cooperation between multiple project participants.

NASSCO Spec: Performance Specification Guideline for Manhole Rehabilitation

Published Year: 2013

  • NASSCO Performance Spec for Manhole Rehab

Magazine Article: To Grout Or Not To Grout?

Published Year: 2013

  • Groundwater can bring an underground mining operation to its knees, but it can be controlled with ingenuity, co-operation and grout expertise

Magazine Article: Sorting Out the Grout

Published Year: 2013

  • Tunnel contractors can choose whether to use cement or chemical grouts. To help them out, Britt Babcock discusses both types, which to use, when to use them and why...and an idea of how much it will all cost.

2013 WEFTEC Paper: Sealing Annular Space and Lateral Connections with Chemical Grouts

Published Year: 2013

  • Acrylamide chemical grout has been used successfully for over 40 years to reduce groundwater infiltration by sealing leaks and joints in mainline and lateral sanitary sewer systems.

AV-100 (Acrylamide) Chemical Resistance Data

Published Year: 2013

  • AV-100 (Acrylamide) Chemical Resistance Data

NASSCO Tech Tips - Understanding the Chemical Grout Process

Published Year: 2012

  • Chemical grouting is one of the olderst techniques used to stop water infiltration into sewer collection systems, Unfortunately, it is also one of the misunderstood.

Flyer: Foundation Grout Solutions

Published Year: 2012

  • AvantiGrout - multiple grout solutions for stabilizing soil and controlling groundwater - before, during and after construction.

2012 No-Dig Paper: Cured in Place Liner Defects - Three Studies of Installed Liner Performance

Published Year: 2012

  • Over the last 6 years, Malcolm Pirnie has conducted a monitoring program of cured in place mainline liners and lateral liners to assess the affect of various variables on long term liner quality, especially with regard to liner porosity/pinhole leakage.